THE LIMPOPO IS UNDER THREAT - 

VOICE YOUR OBJECTION

SAY NO TO EXPLOITING THE LIMPOPO RIVER FOR MEGA-INDUSTRIALISATION

 

SAY NO TO MEGA-ENVIRONMENTAL DEGRADATION

SAY NO TO THE MM SEZ

Limpopo river.JPG

THE CAMPAIGN & OUR CALL FOR OBJECTIONS

NoToSEZ.org is a campaign run by a coalition of interested and affected parties all with deep roots in the Limpopo, who collectively oppose the planned mega-industrial development in Limpopo Province referred to as the Musina-Makhado Energy-Metallurgical Special Economic Zone (EMSEZ) and the Limpopo River dams that will feed it.

 

Our mission is to (1) raise public awareness of the plans and how far they have progressed; (2) the devastating impact coal- and water-guzzling mega-industrialization will have on our water-scarce and sensitive environment and (3) to galvanize the public to object to the draft Environmental Impact Assessment report (DEIR) and its recommendation that the project be approved before the window for comments closes on 22 October 2020

 

We exist to inform, to connect, to spur and channel objections. Please voice yours - It's critical, it's urgent and it takes less than a minute... 

OUR OBJECTIONS 

1. BIG, DIRTY & THIRSTY, THE EMSEZ IS BEING BULLDOZED THROUGH THE APPROVALS PROCESS

Despite the mind-boggling scale of the proposed noxious industrial development and the consequent severe impacts on national water and other natural resources, climate, biodiversity loss, protected areas, agriculture and tourism sectors, pollution of air, water and soil and hazards to human health, no proper feasibility study and no proper assessment of the environmental impacts has ever been undertaken: 

Instead, the MM-SEZ has been designated, the operator license awarded to an opaque Chinese entity, and undisclosed Chinese investors have reportedly committed billions - and now the draft EIA report has been published recommending authorization, even though the actual scope of the  assessment is limited to site clearance of the southern site, for the purported reason that full impact cannot be assessed, because each of the planned industrial plants, mines and mega dams to be built on the Limpopo River will need to be separately assessed after the EMSEZ is approved. 

 

We object to the fatally flawed EIA process and consequently invalid recommendation by the Environmental Assesment Practioner (EAP) in the DEIR that the EMSEZ be authorised. The DEIR must be be withdrawn pending a comprehensive Strategic Environmental Assessment (SEA) as argued for by the Centre for Environmental Rights, acting for groundWork and Earthlife Africa, and we reject Minister Barbara Creecy's claim that there is "no legal requirement for an SEA to be conducted at this time".

2. THE VAMPIRES IN THE BLOOD-BANK

Under the terms of the signed operator agreement, complete control of the land and the mega industrial development project has been surrendered for an effective 120 years to an opaque Chinese company called Shenzhen Hoimor Resources Holding Company with a dubious reputation, to whom all responsibility including for environmental protection, has been transferred - something that appears contrary to its authority, its competence and its own interests.

 

This deal with its vast ramifications for South Africa was signed by a small, under-resourced and conflicted provincial government department, the Limpopo Department of Economic Development, Environment and Tourism, LEDET, which has been given decision-making authority in respect of the proposed EMSEZ. It is also empowered to grant environmental authorisation, which will determine whether the project goes ahead, despite the fact that it also acts as the project's sponsor.

 

We believe that the operator agreement amounts to a total abrogation of government's duty to protect South Africa's interests. We object to LEDET's designation as the competent authority on the grounds that it lacks the jurisdiction and is conflicted in the matter. The DEFF must assume responsibility as provided for in NEMA, 1998 S24C(2)(d))iii).

3. COAL-FIRED DEFIANCE

The proposed EMSEZ - including the 3,300MW coal-fired power station that will be built to power a staggering number of industrial-scale smelting furnaces, together with a raft of new coal and other mines that will be built to feed it - will essentially be a coal-fired hell.

 

The greenhouse gas emissions that will be generated, wholly inadequately assessed but estimated at 1 billion tonnes of CO2 over its lifetime and about 10-16% of South Africa's total carbon budget annually, will constitute a flagrant violation of inter alia South Africa's commitments under the Paris Agreement and government's Constitutional obligations to reduce GHG emissions and the impacts of global warming.

 

We object to the wholly inadequate assessment of the climate impact of the EMSEZ. An accurate estimation of the amount and type of fuels that will be consumed by each component of the planned EMSEZ project annually during operation and over its lifetime, the annual emissions of carbon-dioxide and other air pollutants including mercury and other heavy metals, and the climate impact along with associated environmental, economic and social costs cumulatively from the EMSEZ and the raft of new mines that will supply it, must be undertaken.

4. THE PLUNDER OF LIMPOPO'S WATER

Despite the fact that the Limpopo is severely water-stressed, the assessment of the actual water resources required for the operation of the EMSEZ industrial complex in the DEIR is crude and grossly inadequate. Even the estimates given however, are gob-smacking - at 110million cubic meters per annum, equivalent to the water use of 1.43 million people. And yet the plans to supply those needs, as well as the impact assessment of these plans are even more ill-considered:

 

Essentially, buried in Annexure U of the 878page draft EIA report is a muddy explanation of how 95% of the water requirements will be met by building a mega dam on the already over-allocated Limpopo River at the confluence of the Sand River on the Maremani Nature Reserve - the 200Mm3/a "Musina Dam" - close to the northern site, to capture the annual flood waters of the Limpopo. The assessment of the impact of this water capture on downstream water-users in South Africa and Mozambique is limited to a reference to the averted loss of life and flood damage. The Integrated Water Services Report makes a further reference to additional plans to tap the Zhove dam in Zimbabwe; build a second 200Mn3/a on the Sand River and to siphon the "Eastern Alluvial Aquifer" in the event that the water in the Musina Dam proves insufficient. The series of dams are excluded from the scope of the draft EIA report completely, and the Musina Dam is mentioned not once in the 251-page EMPr. Curiously there is a reference to a R25Bn "unsolicited" quote to build the dam.

We object to the fundamentally flawed analysis in the DEIR of water needs of the EMSEZ and water availability and the unjust plan to use the Limpopo River water without proper assessment of the impacts. An full review in consultation with all affected water-users of the Limpopo Catchment Area Water Management Strategy must be urgently commissioned.

5. WHOSE GAIN AT WHOSE EXPENSE?

The real costs and benefits of the proposed EM SEZ have not been properly accounted for and are highly skewed in their distribution. The draft EIA report itself baldly states, "The proposed project is considered to have an overall high negative environmental impact, with low‐medium positive social and economic impact due to the site being very sensitive in terms of environmental features (ecology, aquatic features, etc.) and the introduction to possible greenhouse gases, air quality, noxious gases, climate change impacts, etc., all which will have a negative impact on the environment and surrounding areas.

On the other side the equation, the benefits of the project as set out in the EIA are vague and unsubstantiated. Although the DEIR argues for the project on the basis of export-driven economic growth, it also mentions the tax incentives on offer inside a SEZ to attract FDI, however, it fails to disclose the extent of the corporate income; VAT; customs and duty-tax relief granted to the operator (all deductions off South Africa's bottom-line). It provides no firm commitments in terms of job creation or supplier contracts for local businesses. Indeed, it is not at all clear from the DEIR how South Africa really benefits from the minerals extraction that will happen on our soil, using our coal, our water and contaminating our environment: On the face if it, the exporter is the foreign-owned entity that holds the rights. It looks rather as if China's gain is at our and the planet's expense.

We object to any authorisation of the EMSEZ being considered given the DEIR's stated conclusion that "The potential negative impacts of the development on the natural, tourism, and agricultural environment of the site and the region may in all likelihood, outweigh the identified positive impacts associated with the potential social and economic development benefits in the longer term." The authorisation must be denied on the grounds that the applicant (who is also the adjudicating authority) cannot reasonably comply with the conditions of authorisation set out in the DEIR, including with respect to guaranteeing a sustainable water supply.

 
WHAT IS THE MUSINA-MAKHADO EMSEZ & WHY OBJECT? 

The MM EMSEZ is an unprecedented multi-billion Rand Chinese-backed plan to develop a "Special Economic Zone" (SEZ) in Limpopo Province for heavy industry on a scale never before contemplated in South Africa.

 

The designated Musina-Makhado SEZ, which spans 60km2 south of the Limpopo River between the border town of Musina and Makhado, encompasses two separate development sites - a northern "logistics" and a southern "energy-metallurgical" site covering an area of 8000ha - that will contain numerous large-scale industrial plants, powered by a coal-fired power station, and fed by a mega dam on the Limpopo River along with 5 new coal and other mines located across another 104,000ha. The planned project includes:

  • A 3,300MW Coal-fired Power Station to power the industrial juggernaut

  • A Coal Washery and Coking Plant

  • A Ferrochrome; Ferromanganese; Silicomanganese and Vanadium – Titanium Magnetite Plant

  • A High Manganese Steel; High Vanadium Steel and Stainless Steel Plant

  • A Lime and Cement Plant

  • Numerous supporting infrastructure and other related developments

  • Two mega dams on the Limpopo River at the confluence with the Sand River 

The proposed development ostensibly supports South Africa and the Limpopo Province's economic development, BUT at grossly inadequately assessed and severe environmental cost: from water resources to carbon-emissions to soil, water and air pollution, the impact will be as unprecedented as the scale of the industrial plant itself, relative to equally poorly assessed real economic benefits. The entire plan since conception has been advanced without anything approximating proper diligence. We at the NoToSEZ.org campaign endorse the position of the Centre for Environmental Rights and other environmental watchdogs that the MM SEZ is NOT in the interests of the people of South Africa, Zimbabwe or Mozambique, and support their opposition to its authorization. 

 

BE IN THE KNOW

ULTIMATE CAMPAIGN GOALS - WATER RESOURCE PROTECTION

Grass-roots - Life-blood

NoToSEZ.org campaigns to raise awareness and raise objections to the Musina-Makhado EMSEZ - ultimately to save our water resources.

 

We represent a diverse coalition of local farming, conservation, business and community interests, who share a dependency on and commitment to the Limpopo River and surrounding Limpopo Valley, and who will all be directly and severely impacted by the EMSEZ if it is authorized. Our EMSEZ objection is concentrated on our water resources: We seek to prevent the plunder of the Limpopo River water and the resultant destruction of the riverbank riparian zone as well as our pristine Limpopo Ridge Bushveld within the Vhembe Biosphere Reserve, and the ruin of the local commercial farming industry and subsistence farming communities. Our ultimate aim is to use the threat that the EMSEZ represents to drive reform of the way our scarce water and other natural resources are managed and allocated in the Limpopo. 

We are a source of information and a forum for connecting to magnify the effectiveness of the opposition. We welcome engagement with other affected communities, industry associations, nature reserves, environmental agencies, media as well as government and of course the proponents of the EMSEZ. 

ACTION

We oppose the proposed coal-fired mega industrial development known as the Musina-Makhado EMSEZ and the severe environmental impact it will have -  especially on our scarce water resources, we object to the environmental impact assessment on the grounds that the entire EIA process followed and assessment is fundamentally flawed - and are acting to raise awareness and raise objections to the EIA before the deadline of 22 October 2020.

ADVOCACY

We are striving to find new fair and sustainable solutions to water scarcity in an increasingly water-stressed region. We believe that the threat posed by the dangerously ill-conceived EMSEZ to Limpopo's water sources and users thrusts the need for deep reform of water resource management and allocation in Limpopo to the fore. We are working to ensure that lasting solutions to the growing water crisis are found beyond the abandonment of the MM-SEZ.

 
Landscape - Baobab ridges.jpg

The road to ruin is paved with apathy...

 

GET IN TOUCH WITH US

  • Facebook
  • Twitter
  • LinkedIn
Image 11.jpg